US 98 over PEARL RIVER

0.6 MI E SR 35 NORTH · County 091, Mississippi · Built 1933 · 2 Lanes · 8,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
21000980461185B
Year Built
1933
Length
207 m (679.1 ft)
Max Span
57.9 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
8,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.