US 98 over EAST FORK AMITE RIVER

10.2 MI W I 55 · County 085, Mississippi · Built 1948 · 20 Lanes · 3,400 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
210009804306330
Year Built
1948
Length
61 m (200.1 ft)
Max Span
12.2 m
Width
9 m (29.5 ft)
Lanes
20
Daily Traffic
3,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$722,000,000
Total Project Cost
$999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.