US 90 over EAST PEARL RIVER

MISS/LA STATE LINE · County 045, Mississippi · Built 1934 · 2 Lanes · 2,600 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
210009002300010
Year Built
1934
Length
292.9 m (961 ft)
Max Span
85.3 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
2,600
Material
Steel
Design
Movable - Swing
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.