US 80 over TONACANA CREEK

5.1 MI E SR 503 · County 101, Mississippi · Built 1929 · 2 Lanes · 1,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 5 Fair

Location

32.325961, -88.940314

This bridge is in worse condition than 81.4% of bridges in County 101. The average bridge in Mississippi is 0 years old; this one is 97 years old.

Nearby Bridges

Bridge Details

Structure #
210008005112140
Year Built
1929
Length
29.9 m (98.1 ft)
Max Span
9.1 m
Width
7.2 m (23.6 ft)
Lanes
2
Daily Traffic
1,000
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$309,000,000
Total Project Cost
$921,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.