US 80 over I 59

US 80 OVER I 59/I 20 · County 075, Mississippi · Built 1960 · 2 Lanes · 1,400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
8
Very Good

Bridge Details

Structure #
210008003815260
Year Built
1960
Length
84.7 m (277.9 ft)
Max Span
25 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
1,400
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.