US 80 over SLOUGH

0.5 MI E NEWTON CL · County 075, Mississippi · Built 1928 · 2 Lanes · 870 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
210008003812350
Year Built
1928
Length
24.4 m (80.1 ft)
Max Span
7.3 m
Width
6.9 m (22.6 ft)
Lanes
2
Daily Traffic
870
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$313,000,000
Total Project Cost
$932,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.