US 49 over RICHLAND CREEK

1.3 MI S I 20 · County 121, Mississippi · Built 1965 · 2 Lanes · 23,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
21000490611536B
Year Built
1965
Length
103.6 m (339.9 ft)
Max Span
18.3 m
Width
21.9 m (71.9 ft)
Lanes
2
Daily Traffic
23,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$155,000,000
Total Project Cost
$411,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.