FRONTAGE RD over SOWASHEE CREEK
NE FRONTAGE RD · County 075, Mississippi · Built 1965 · 2 Lanes · 6,300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
32.354564, -88.692964
This bridge is in worse condition than 58.3% of bridges in County 075. The average bridge in Mississippi is 0 years old; this one is 61 years old.
Nearby Bridges
SR 145 over SOWASHEE CREEK
Built 1990
I 59 FRONTAGE RD over SOWASHEE CREEK
Built 1973
I 20/I 59 over SR 145
Built 1957
18TH AVE over SOWASHEE CREEK
Built 1989
2ND STREET SOUTH over CREEK
Built 2001
I 20/I 59 over M AND B RR FRT RD CON
Built 1973
SOWASHEE ST. over BRANCH
Built 1928
GRANDE AVE over SOWASHEE CREEK
Built 1959
16TH AVE SOUTH over CREEK
Built 2001
22ND AVE over RAILROAD
Built 1946
Bridge Details
- Structure #
- 180005903815310
- Year Built
- 1965
- Length
- 79.2 m (259.8 ft)
- Max Span
- 12.2 m
- Width
- 10 m (32.8 ft)
- Lanes
- 2
- Daily Traffic
- 6,300
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $118,000,000
- Total Project Cost
- $318,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.