I 59 over WEST UNION ROAD

6.4 MI N SR 43 NORTH · County 109, Mississippi · Built 1963 · 2 Lanes · 11,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
11000590550108B
Year Built
1963
Reconstructed
2015
Length
36.9 m (121.1 ft)
Max Span
12.2 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
11,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$20,000,000
Total Project Cost
$220,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.