I 20/I 59 over TOOMSUBA CREEK

7.6 MI N US 45 · County 075, Mississippi · Built 1961 · 3 Lanes · 18,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
11000590381646B
Year Built
1961
Length
61 m (200.1 ft)
Max Span
12.2 m
Width
13.7 m (44.9 ft)
Lanes
3
Daily Traffic
18,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$148,000,000
Total Project Cost
$348,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.