I 55 over BEAVER CREEK

2.6 MI N US 98 · County 113, Mississippi · Built 1965 · 20 Lanes · 11,500 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
11000550570226B
Year Built
1965
Length
48.8 m (160.1 ft)
Max Span
12.2 m
Width
13.7 m (44.9 ft)
Lanes
20
Daily Traffic
11,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$127,000,000
Total Project Cost
$327,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.