I 55 over SR 570

I 55 OVER SR 570 · County 113, Mississippi · Built 1959 · 20 Lanes · 14,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
11000550570180A
Year Built
1959
Length
69.2 m (227 ft)
Max Span
20.4 m
Width
9.4 m (30.8 ft)
Lanes
20
Daily Traffic
14,500
Material
Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$181,000,000
Total Project Cost
$381,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.