I 55 over TALLAHATCHIE RELIEF

4.0 MI N SR 6 · County 107, Mississippi · Built 1960 · 2 Lanes · 12,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

34.367011, -89.911672

This bridge is in worse condition than 40.3% of bridges in County 107. The average bridge in Mississippi is 0 years old; this one is 66 years old.

Nearby Bridges

Bridge Details

Structure #
11000550542473B
Year Built
1960
Reconstructed
2020
Length
48.8 m (160.1 ft)
Max Span
12.2 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
12,500
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$576,000,000
Total Project Cost
$999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.