I 55 over SAWYER ROAD

2.6 MI N US 82 · County 097, Mississippi · Built 1965 · 2 Lanes · 7,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
11000550491866A
Year Built
1965
Length
55.5 m (182.1 ft)
Max Span
21.3 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
7,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$167,000,000
Total Project Cost
$193,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.