I 55 over BROOKWAY BLVD

2.2 MI N US 84 · County 085, Mississippi · Built 1966 · 20 Lanes · 12,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

31.578692, -90.475169

This bridge is in worse condition than 35.5% of bridges in County 085. The average bridge in Mississippi is 0 years old; this one is 60 years old.

Nearby Bridges

Bridge Details

Structure #
11000550430400B
Year Built
1966
Length
86.3 m (283.1 ft)
Max Span
21.3 m
Width
13.7 m (44.9 ft)
Lanes
20
Daily Traffic
12,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$225,000,000
Total Project Cost
$425,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.