I 55 over YALOBUSHA RIVER RELIEF

1.3 MI N SR 7 · County 043, Mississippi · Built 1965 · 2 Lanes · 9,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
11000550222071B
Year Built
1965
Length
73.2 m (240.2 ft)
Max Span
12.2 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
9,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$220,000,000
Total Project Cost
$246,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.