I 55 over COUNTY ROAD 22

2.6 MI N SR 35 · County 015, Mississippi · Built 1964 · 2 Lanes · 7,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
11000550081760B
Year Built
1964
Length
46.6 m (152.9 ft)
Max Span
15.5 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
7,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$143,000,000
Total Project Cost
$169,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.