I 20 over US 80

I 20 OVER US 80 · County 121, Mississippi · Built 1966 · 2 Lanes · 17,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
11000200610601B
Year Built
1966
Length
110.3 m (361.9 ft)
Max Span
21.3 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
17,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$180,000,000
Total Project Cost
$380,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.