0.1 MI W RANKIN CL · County 049, Mississippi · Built 1966 · 3 Lanes · 51,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 7 Good

Location

32.277389, -90.185911

This bridge is in worse condition than 18.5% of bridges in County 049. The average bridge in Mississippi is 0 years old; this one is 60 years old.

Nearby Bridges

Bridge Details

Structure #
11000200250462A
Year Built
1966
Length
177.4 m (582 ft)
Max Span
21.3 m
Width
13.7 m (44.9 ft)
Lanes
3
Daily Traffic
51,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.