T 76 over TWELVE MILE CREEK

0.4 MI W OF JCT CSAH 13 · County 155, Minnesota · Built 1978 · 2 Lanes · 4 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
L9780
Year Built
1978
Length
14.7 m (48.2 ft)
Max Span
4.3 m
Lanes
2
Daily Traffic
4
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$142,000,000
Total Project Cost
$104,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.