T 165 over TEN MILE CREEK

0.2 MI N OF JCT CSAH 8 · County 073, Minnesota · Built 1967 · 2 Lanes · 42 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
L9128
Year Built
1967
Length
16.4 m (53.8 ft)
Max Span
5.5 m
Width
6.5 m (21.3 ft)
Lanes
2
Daily Traffic
42
Material
Wood or Timber
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$395,000,000
Total Project Cost
$395,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.