T 149 over FIVE MILE CREEK
1.4 MI SW OF JCT TH 7 · County 011, Minnesota · Built 1968 · 2 Lanes · 10 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
3
Serious
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 3 | Serious |
Location
45.210103, -96.133164
This bridge is in worse condition than 94.1% of bridges in County 011. The average bridge in Minnesota is 0 years old; this one is 58 years old.
Nearby Bridges
MN 7 over FIVE MILE CREEK
Built 1934
T 148 over FIVE MILE CREEK
Built 1921
T 156 over MINNESOTA RIVER
Built 1991
CR 51 over POMME DE TERRE RIVER
Built 1986
CSAH 34 over CO DITCH # 3
Built 1988
T 40 over CO DITCH #3
Built 2008
T 41 over CO DITCH #3
Built 2008
CR 75 over CD# 2
Built 2008
T 15 over CO DITCH # 3
Built 1976
T 53 over CO DITCH # 3
Built 2000
Bridge Details
- Structure #
- L8877
- Year Built
- 1968
- Length
- 6.2 m (20.3 ft)
- Max Span
- 5.9 m
- Width
- 6.1 m (20 ft)
- Lanes
- 2
- Daily Traffic
- 10
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $318,000,000
- Total Project Cost
- $24,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.