T 127 over RICE CREEK
0.6 MI W OF JCT CSAH 15 · County 043, Minnesota · Built 1965 · 2 Lanes · 82 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
43.774814, -94.049425
This bridge is in worse condition than 97.3% of bridges in County 043. The average bridge in Minnesota is 0 years old; this one is 61 years old.
Nearby Bridges
T 137 over RICE CREEK
Built 1962
T 137 over DITCH
Built 2003
T 142 over RICE CREEK
Built 1982
T 142 over JUD DITCH # 1
Built 1980
T 115 over RICE CREEK
Built 1920
CSAH 18 over RICE CREEK
Built 1982
T 149 over CO DITCH # 3
Built 1979
CSAH 15 over RICE CREEK
Built 1978
CSAH 17 over CO DITCH # 3
Built 1999
T 154 over CO DITCH # 3
Built 1981
Bridge Details
- Structure #
- L8841
- Year Built
- 1965
- Length
- 12.2 m (40 ft)
- Max Span
- 5.8 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 82
- Material
- Wood or Timber
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $180,000,000
- Total Project Cost
- $198,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.