T 185 over JOE RIVER

0.4 MI E OF JCT CSAH 16 · County 069, Minnesota · Built 1968 · 2 Lanes · 8 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
4
Poor
Superstructure
4
Poor
Substructure
3
Serious

Bridge Details

Structure #
L8832
Year Built
1968
Length
18.9 m (62 ft)
Max Span
7.9 m
Width
6.6 m (21.7 ft)
Lanes
2
Daily Traffic
8
Material
Wood or Timber
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$194,000,000
Total Project Cost
$194,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.