T 215 over S BR BUFFALO RIVER

0.5 MI S OF JCT CR 67 · County 027, Minnesota · Built 1950 · 2 Lanes · 21 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Critical
Deck
1
Imminent Failure
Superstructure
3
Serious
Substructure
3
Serious

Condition Ratings

ComponentRatingDescription
Deck 1 Imminent Failure
Superstructure 3 Serious
Substructure 3 Serious

Location

46.768711, -96.631753

This bridge is in worse condition than 99.6% of bridges in County 027. The average bridge in Minnesota is 0 years old; this one is 76 years old.

Nearby Bridges

Bridge Details

Structure #
L8296
Year Built
1950
Length
24.4 m (80.1 ft)
Max Span
11.7 m
Width
6.2 m (20.3 ft)
Lanes
2
Daily Traffic
21
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$202,000,000
Total Project Cost
$220,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.