M 34 over CHANNEL

1.2 MI SE OF JCT CR75 · County 163, Minnesota · Built 1933 · 1 Lanes · 420 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

44.790925, -92.979806

This bridge is in worse condition than 75.2% of bridges in County 163. The average bridge in Minnesota is 0 years old; this one is 93 years old.

Nearby Bridges

Bridge Details

Structure #
L8159
Year Built
1933
Length
38.9 m (127.6 ft)
Max Span
22.9 m
Width
6.1 m (20 ft)
Lanes
1
Daily Traffic
420
Material
Steel
Design
Truss - Thru
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$557,000,000
Total Project Cost
$365,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.