T 530 over BNSF RR
0.5 MI W OF JCT TH 2 · County 119, Minnesota · Built 1925 · 1 Lanes · 36 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
47.528353, -95.666317
This bridge is in worse condition than 97% of bridges in County 119. The average bridge in Minnesota is 0 years old; this one is 101 years old.
Nearby Bridges
US 2 over STREAM
Built 2018
T 553 over POPLAR RIVER
Built 1983
CSAH 1 over POPLAR RIVER
Built 1966
CSAH 27 over POPLAR RIVER
Built 1980
CSAH 6 over Poplar River
Built 2001
CSAH 30 over POPLAR RIVER
Built 1974
T 750 over SAND HILL RIVER (CD #176
Built 1991
CR 101 over WILD RICE RIVER
Built 1985
T 751 over SAND HILL RIVER
Built 1990
T 591 over POPLAR RIVER
Built 2023
Bridge Details
- Structure #
- L7619
- Year Built
- 1925
- Length
- 31.5 m (103.3 ft)
- Max Span
- 6.2 m
- Width
- 5.4 m (17.7 ft)
- Lanes
- 1
- Daily Traffic
- 36
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- Railroad
- Last Inspected
- N/A
- Est. Improvement
- $400,000,000
- Total Project Cost
- $297,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.