T 95 over RABBIT RIVER
0.3 MI N OF JCT TH9 · County 167, Minnesota · Built 1920 · 2 Lanes · 20 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
3
Serious
Substructure
3
Serious
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 3 | Serious |
| Substructure | 3 | Serious |
Location
46.08775, -96.389308
This bridge is in worse condition than 99.5% of bridges in County 167. The average bridge in Minnesota is 0 years old; this one is 106 years old.
Nearby Bridges
MN 9 over RABBIT RIVER
Built 1991
T 95 over CD #12
Built 2018
T 116 over S FK RABBIT RIVER
Built 1993
CSAH 2 over JUD DITCH # 12
Built 1950
CSAH 4 over RABBIT RIVER
Built 2023
CR 152 over S FK RABBIT RIVER
Built 1999
CSAH 2 over RABBIT RIVER
Built 2005
T 6 over JUD DITCH # 12
Built 1936
T 151 over S FK RABBIT RIVER
Built 1995
CSAH 17 over STREAM
Built 1995
Bridge Details
- Structure #
- L7356
- Year Built
- 1920
- Length
- 12.5 m (41 ft)
- Max Span
- 11.6 m
- Width
- 6.1 m (20 ft)
- Lanes
- 2
- Daily Traffic
- 20
- Material
- Steel
- Design
- Truss - Thru
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $360,000,000
- Total Project Cost
- $375,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.