T 36 over ELM CREEK

0.6 MI N OF JCT CR 142 · County 091, Minnesota · Built 1918 · 2 Lanes · 67 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

43.768181, -94.448025

This bridge is in worse condition than 66.7% of bridges in County 091. The average bridge in Minnesota is 0 years old; this one is 108 years old.

Nearby Bridges

Bridge Details

Structure #
L7217
Year Built
1918
Length
16.8 m (55.1 ft)
Max Span
15.2 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
67
Material
Concrete
Design
Girder and Floorbeam System
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$185,000,000
Total Project Cost
$155,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.