T 411 over TURTLE CREEK

0.1 MI E OF JCT CSAH 25 · County 153, Minnesota · Built 1940 · 2 Lanes · 15 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
L7075
Year Built
1940
Reconstructed
2016
Length
17.2 m (56.4 ft)
Max Span
4.7 m
Lanes
2
Daily Traffic
15
Material
Steel
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$437,163,000
Total Project Cost
$437,163,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.