M 58 over CANNON RIVER

0.5 MI N OF JCT TH 19 · County 049, Minnesota · Built 1909 · 1 Lanes · 150 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 6 Satisfactory
Substructure 5 Fair

Location

44.513461, -92.904264

This bridge is in worse condition than 89.7% of bridges in County 049. The average bridge in Minnesota is 0 years old; this one is 117 years old.

Nearby Bridges

Bridge Details

Structure #
L5391
Year Built
1909
Length
55.7 m (182.7 ft)
Max Span
54 m
Width
5.4 m (17.7 ft)
Lanes
1
Daily Traffic
150
Material
Steel
Design
Truss - Thru
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.