M 34 over SNAKE RIVER

0.1 MI N OF JCT TH 1 · County 089, Minnesota · Built 1959 · 1 Lanes · 100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
L4208
Year Built
1959
Length
23.8 m (78.1 ft)
Max Span
8 m
Width
6.4 m (21 ft)
Lanes
1
Daily Traffic
100
Material
Wood or Timber
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$225,000,000
Total Project Cost
$279,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.