PVT 80 over RICEFORD CREEK
4.4 MI S OF JCT CSAH 4 · County 055, Minnesota · Built 1905 · 1 Lanes · 4 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
43.616083, -91.715011
This bridge is in worse condition than 94.7% of bridges in County 055. The average bridge in Minnesota is 0 years old; this one is 121 years old.
Nearby Bridges
T 125 over RICEFORD CREEK
Built 1986
T 126 over DRY RUN
Built 2022
CSAH 19 over RICEFORD CREEK
Built 2017
T 125 over RICEFORD CREEK
Built 2005
T 125 over RICEFORD CREEK
Built 1978
T 89 over STREAM
Built 1978
T 88 over RICEFORD CREEK
Built 2009
CSAH 4 over RICEFORD CREEK
Built 2005
CSAH 13 over STREAM
Built 2008
CSAH 29 over RICEFORD CREEK
Built 2024
Bridge Details
- Structure #
- L4005
- Year Built
- 1905
- Length
- 16.2 m (53.1 ft)
- Max Span
- 12.5 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 4
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $172,000,000
- Total Project Cost
- $327,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.