SERVICE RD over KANARANZI CREEK
0.2 MI S OF JCT I-90 · County 105, Minnesota · Built 1915 · 1 Lanes · 1 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
43.634844, -95.973192
This bridge is in worse condition than 98.7% of bridges in County 105. The average bridge in Minnesota is 0 years old; this one is 111 years old.
Nearby Bridges
T 119 over KANARANZI CREEK
Built 1990
I 90 over KANARANZI CREEK
Built 1965
I 90 over KANARANZI CREEK
Built 1965
CSAH 35 over STREAM
Built 2003
CSAH 35 over KANARANZI CREEK
Built 2003
I 90 over UP RR; CSAH 35
Built 1965
I 90 over UP RR; CSAH 35
Built 1965
CSAH 32 over KANARANZI CREEK
Built 1975
CSAH 19 over I 90
Built 1965
T 8 over STREAM
Built 1982
Bridge Details
- Structure #
- L3462A
- Year Built
- 1915
- Length
- 18.8 m (61.7 ft)
- Max Span
- 18.8 m
- Width
- 6.2 m (20.3 ft)
- Lanes
- 1
- Daily Traffic
- 1
- Material
- Steel
- Design
- Truss - Thru
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $239,000,000
- Total Project Cost
- $1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.