CSAH 16 over STREAM

1.4 MI W OF JCT CSAH 15 · County 105, Minnesota · Built 1948 · 2 Lanes · 900 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
L3352
Year Built
1948
Length
12 m (39.4 ft)
Max Span
4.3 m
Lanes
2
Daily Traffic
900
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$149,000,000
Total Project Cost
$271,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.