PERMANENTLY CLOSED over CANNON RIVER

0.1 MI SE OF JCT CSAH 47 · County 037, Minnesota · Built 1909 · 1 Lanes · 1 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
2
Critical
Superstructure
5
Fair
Substructure
4
Poor

Condition Ratings

ComponentRatingDescription
Deck 2 Critical
Superstructure 5 Fair
Substructure 4 Poor

Location

44.487461, -93.128364

This bridge is in worse condition than 99.6% of bridges in County 037. The average bridge in Minnesota is 0 years old; this one is 117 years old.

Nearby Bridges

Bridge Details

Structure #
L3275
Year Built
1909
Length
43.6 m (143 ft)
Max Span
41.8 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
1
Material
Steel
Design
Truss - Thru
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$625,000,000
Total Project Cost
$514,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.