T 201 over TWO RIVERS
1.1 MI W OF JCT CSAH 24 · County 097, Minnesota · Built 1940 · 2 Lanes · 70 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
45.819331, -94.434753
This bridge is in worse condition than 73.2% of bridges in County 097. The average bridge in Minnesota is 0 years old; this one is 86 years old.
Nearby Bridges
T 259 over TWO RIVERS
Built 1995
T 259 over LITTLE TWO RIVER
Built 1996
T 141 over TWO RIVERS
Built 2021
CSAH 21 over S BR TWO RIVERS
Built 1970
CSAH 24 over TWO RIVERS
Built 1978
T 141 over LITTLE TWO RIVER
Built 2009
T 149 over TWO RIVERS
Built 1942
MN 238 over LITTLE TWO RIVER
Built 1989
T 601 over TWO RIVERS
Built 2015
T 138 over LITTLE TWO RIVER
Built 1996
Bridge Details
- Structure #
- L2927
- Year Built
- 1940
- Length
- 10.2 m (33.5 ft)
- Max Span
- 9.3 m
- Width
- 8 m (26.2 ft)
- Lanes
- 2
- Daily Traffic
- 70
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $250,000,000
- Total Project Cost
- $280,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.