MN 48 over GRINDSTONE RIVER
2.2 MI E OF JCT TH 35 · County 115, Minnesota · Built 1964 · 2 Lanes · 2,713 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
46.010919, -92.887633
This bridge is in worse condition than 85.5% of bridges in County 115. The average bridge in Minnesota is 0 years old; this one is 62 years old.
Nearby Bridges
CR 140 over GRINDSTONE RIVER
Built 1997
MN 48 over GRINDSTONE RIVER
Built 1941
CR 140 over GRINDSTONE RIVER
Built 2022
I 35 over GRINDSTONE RIVER
Built 2024
I 35 over GRINDSTONE RIVER
Built 1960
CSAH 61 over I 35
Built 1959
MN 48 over KETTLE RIVER
Built 1997
I 35 over BNSF RR
Built 2024
I 35 over BNSF RR
Built 1960
CSAH 61 over GRINDSTONE RIVER
Built 1979
Bridge Details
- Structure #
- 9819
- Year Built
- 1964
- Length
- 53 m (173.9 ft)
- Max Span
- 17.7 m
- Width
- 10.8 m (35.4 ft)
- Lanes
- 2
- Daily Traffic
- 2,713
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $827,000,000
- Total Project Cost
- $603,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.