CR 77 over BEAR RIVER

2.3 MI W OF JCT TH 71 · County 071, Minnesota · Built 1997 · 2 Lanes · 22 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
97520
Year Built
1997
Length
10.4 m (34.1 ft)
Max Span
4.2 m
Lanes
2
Daily Traffic
22
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.