T 880 over PELICAN RIVER

0.2 MI E OF JCT TH 59 · County 111, Minnesota · Built 1994 · 2 Lanes · 100 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
97438
Year Built
1994
Length
14.8 m (48.6 ft)
Max Span
3.9 m
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$163,000,000
Total Project Cost
$186,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.