I 90 over BNSF RR

0.3 MI E OF S D ST LINE · County 133, Minnesota · Built 1960 · 2 Lanes · 7,555 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
9686
Year Built
1960
Reconstructed
1982
Length
36.4 m (119.4 ft)
Max Span
12.1 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
7,555
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$696,000,000
Total Project Cost
$403,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.