CSAH 9 over STREAM

0.1 MI SW OF JCT TH 75 · County 155, Minnesota · Built 1991 · 2 Lanes · 215 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
96753
Year Built
1991
Length
12.8 m (42 ft)
Max Span
5.2 m
Lanes
2
Daily Traffic
215
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.