T 137 over STREAM
1.9 MI W OF JCT CSAH 8 · County 127, Minnesota · Built 1980 · 2 Lanes · 20 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
44.268267, -95.591011
This bridge is in worse condition than 81.1% of bridges in County 127. The average bridge in Minnesota is 0 years old; this one is 46 years old.
Nearby Bridges
T 328 over STREAM
Built 1980
CR 79 over STREAM
Built 1981
T 408 over STREAM
Built 1981
CR 71 over JUD DITCH # 9
Built 1977
CSAH 8 over STREAM
Built 1977
T 126 over JUD DITCH # 22
Built 1994
CR 73 over STREAM
Built 1984
US 14 over STREAM
Built 1931
T 137 over STREAM
Built 2023
T 126 over JUD DITCH # 9
Built 1979
Bridge Details
- Structure #
- 95238
- Year Built
- 1980
- Length
- 9 m (29.5 ft)
- Max Span
- 3.6 m
- Lanes
- 2
- Daily Traffic
- 20
- Material
- Steel
- Design
- Culvert
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $490,000,000
- Total Project Cost
- $540,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.