CSAH 13 over I 90

6.0 MI E OF JCT TH 56 · County 099, Minnesota · Built 1960 · 2 Lanes · 375 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 4 Poor
Superstructure 4 Poor
Substructure 5 Fair

Location

43.675672, -92.749397

This bridge is in worse condition than 93% of bridges in County 099. The average bridge in Minnesota is 0 years old; this one is 66 years old.

Nearby Bridges

Bridge Details

Structure #
9507
Year Built
1960
Length
68.2 m (223.8 ft)
Max Span
22 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
375
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$727,000,000
Total Project Cost
$336,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.