CSAH 11 over STREAM

1.2 MI S OF JCT CSAH 50 · County 019, Minnesota · Built 1976 · 2 Lanes · 4,280 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
93218
Year Built
1976
Length
15.3 m (50.2 ft)
Max Span
2.9 m
Lanes
2
Daily Traffic
4,280
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$211,000,000
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.