MN 73 over WEST SWAN RIVER

9.2 MI S OF S JCT TH 169 · County 137, Minnesota · Built 1957 · 2 Lanes · 1,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
9261
Year Built
1957
Length
22.9 m (75.1 ft)
Max Span
7.6 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
1,300
Material
Concrete
Design
Channel Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$325,000,000
Total Project Cost
$261,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.