US 218 over I 90

AT THE E JCT TH 218 · County 099, Minnesota · Built 1959 · 2 Lanes · 3,900 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 4 Poor
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

43.674072, -92.939414

This bridge is in worse condition than 93% of bridges in County 099. The average bridge in Minnesota is 0 years old; this one is 67 years old.

Nearby Bridges

Bridge Details

Structure #
9201
Year Built
1959
Length
55.1 m (180.8 ft)
Max Span
16.9 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
3,900
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$246,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.