T 37 over JUD DITCH # 3

1.0 MI W OF JCT TH 86 · County 063, Minnesota · Built 1979 · 2 Lanes · 20 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
91845
Year Built
1979
Length
11.4 m (37.4 ft)
Max Span
4.5 m
Lanes
2
Daily Traffic
20
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$110,000,000
Total Project Cost
$83,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.