I 94 over MCKNIGHT RD
1.0 MI W OF JCT TH 120 · County 123, Minnesota · Built 1962 · 3 Lanes · 41,000 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
44.950172, -93.004831
This bridge is in worse condition than 40.1% of bridges in County 123. The average bridge in Minnesota is 0 years old; this one is 64 years old.
Nearby Bridges
I 94 over MCKNIGHT RD
Built 1963
LRT over MCKNIGHT RD; RAMP
Built 2024
MSAS 215 over I 94
Built 1969
MSAS 215 over BRT
Built 2023
LRT over CENTURY AVE N
Built 2024
I 94 over TH 120
Built 1962
I 94 over TH 120
Built 1962
CSAH 65 over I 94
Built 1969
CSAH 65 over GOLD LINE BRT
Built 2024
US 61 over BIKE PATH
Built 1986
Bridge Details
- Structure #
- 9145
- Year Built
- 1962
- Length
- 47.9 m (157.2 ft)
- Max Span
- 23.9 m
- Width
- 18.5 m (60.7 ft)
- Lanes
- 3
- Daily Traffic
- 41,000
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $999,999,000
- Total Project Cost
- $726,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.