T 106 over JUD DITCH # 13

1.3 MI W OF JCT TH 254 · County 043, Minnesota · Built 1976 · 2 Lanes · 35 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
91361
Year Built
1976
Length
9.4 m (30.8 ft)
Max Span
4.3 m
Lanes
2
Daily Traffic
35
Material
Steel
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$275,000,000
Total Project Cost
$325,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.